Alumnita is implementing a quality management system to ISO 9001, alongside ISO 14001 and ISO 3834-2 for welding quality requirements. The certificate is not issued yet and we will announce it separately. What matters to a buyer is what the system already changes on the shop floor.
What ISO 9001 guarantees — and what it does not
ISO 9001 describes a management system, not a quality level for a part. It does not promise ±0.1 mm on a milled face. It requires that the way a part is made is defined, recorded, measured and corrected when it goes wrong. A certified shop with no measurement data for your part is worth less than an uncertified one that sends a dimensional report with every batch.
| Covered by the system | Not covered |
|---|---|
| Documented processes and work instructions at the machine | The achievable tolerance of a given process |
| Traceability of material and operations per order | Whether the grade you specified suits the application |
| Calibrated gauges and recorded results | Process capability – Cp / Cpk is agreed separately |
| Revision control, so the shop builds the current drawing | Errors inside the drawing you supplied |
Process control and drawing revisions
Each repeat part carries a route card: material and grade, the programme for the 12 kW fibre laser, bend sequence and tooling for press-brake bending, weld parameters, coating specification, assembly steps. Superseded drawings are withdrawn from the floor, not left in a folder: if you release Rev. C while 200 parts of Rev. B are in series production, we need it in writing with a revision index. Verbally agreed changes are the commonest reason a batch ends up technically correct and commercially useless.
Material certificates and traceability
Material is checked on receipt against the order: grade, temper, thickness, surface condition, dimensions, transport damage. Stainless 1.4301 and 1.4404 look identical and are never separated by eye.
- EN 10204 2.2 – test report, non-specific inspection. Adequate for general structural and enclosure work.
- EN 10204 3.1 – inspection certificate with actual values for the delivered lot. Specify it for load-bearing or safety-relevant parts: it must be bought as 3.1 and cannot be created retrospectively from stock.
- EN 10204 3.2 – countersigned by a third party. Rare in sheet metal work; adds cost and lead time.
The lot number then follows the job through nesting, cut blanks, bending, welding, coating and assembly to the delivery note. The buyer's test is blunt: hand over a delivery note from eight months ago and ask which lot it came from. Be realistic about depth – per-piece serialisation on a 5,000-off bracket costs money for no benefit.
First article inspection
New drawing parts are inspected before the batch is released. A steady share of new drawings contain a feature that cannot be made as drawn, or a datum no gauge can reach. The report contains:
- Identification – part number, drawing number, exact revision index inspected.
- Ballooned drawing – every dimension and requirement numbered.
- Results table – nominal, tolerance, actual value, pass/fail, instrument used.
- Material and finish – certificate reference, coating specification, measured film thickness.
- Deviations – a written concession request, never a silent decision.
On a prototype or pilot batch it adds days, not weeks.
Calibration and how much to inspect
A measurement is worthless if the instrument is unknown. Callipers, micrometers, coating thickness and weld gauges are individually identified, held to a calibration interval and withdrawn when due, so a disputed result traces to an instrument and a date. A supplier claiming 100 % inspection of everything is either charging you for it or not being straight.
| Approach | Right for | Wrong for |
|---|---|---|
| FAI plus in-process checks | Stable repeat parts, medium and large series | Features where any escape is unacceptable |
| Sampling to an agreed plan | High-volume stamped and cut parts | First runs with no process history |
| 100 % on selected features | Fits, functional bores, sealing and safety features | Every dimension on the drawing |
| 100 % on all features | Small batches of complex assemblies | Series work – the economics do not hold |
Mark three to six critical features, agree the method for those, sample the rest.
When a batch is wrong
- Containment first – stop the process, quarantine suspect stock, state what may already be in your building.
- Written notification within one working day, naming quantity and feature – not a phone call that leaves no record.
- Root cause, not a symptom – "operator error" is where the analysis stopped. A programme without a check, a worn tool with no replacement interval, a revision that never reached the machine: those are root causes.
- Corrective action with an owner, a date and a changed work instruction, then verified on the next batch.
Expect an 8D-style report within ten working days for a significant escape. If your industry needs a set format, send the template with the enquiry.

Suppliers, delivery documents and audits
Anodising, galvanising, heat treatment and bought-in hardware come from external suppliers, whose performance becomes ours; they are rated on delivered quality and on-time performance, and critical processes are not moved mid-project without telling you. With the delivery, where agreed in the order: delivery note with part and drawing numbers plus revision indices, quantity per lot, certificates at the specified EN 10204 level, a dimensional or FAI report, specification and measured film thickness for powder-coated parts, and a concession record for any deviation. Decide this at enquiry stage; documentation requested after delivery is slow and sometimes impossible to reconstruct.
Audits are welcome and take most of a day: material identification, the production equipment and its maintenance records, calibration records, work instructions at the machine, the non-conformance log, and a traceability exercise on a part you pick. Ask for a real non-conformance file, not the showpiece folder – a log full of closed-out problems beats one that is suspiciously empty.
A frank note on certificates
A certificate says an auditor was satisfied with a system during one particular week; it does not say your parts will be right. When qualifying a contract manufacturing partner in the EU, four things are worth more than the certificate number: an FAI report for a part like yours, a live traceability exercise, a closed non-conformance file, and the answer to "what did you get wrong recently and what changed?". Send a drawing through the quote request form and judge us on those.
FAQ
Does Alumnita hold an ISO 9001 certificate?
Not yet. The system is being implemented and prepared for certification, together with ISO 14001 and ISO 3834-2.
Can you supply EN 10204 3.1 certificates?
Yes, when 3.1 is specified in the enquiry so the material is bought at that level. It cannot be issued retrospectively for stock delivered under 2.2.
Will you provide a first article inspection report?
Yes, for new drawing parts and on request after a revision. Say so at enquiry stage if you need a ballooned drawing or your own template.
Do you inspect every part 100 %?
Only where that is the right answer: small batches of complex assemblies, or specific critical features. For series work we inspect agreed critical features and sample the rest.